Project Description

The modeling team strictly followed the representation of the project, including the important areas, respectively the main building, the offices and the parking spaces. As a lighting system, LED lights have been installed and they have been connected to a single circuit system. Each LED has been placed systematically, for example above the entrances in buildings, in car passages or parking spaces.

The whole installation is surrounded by greenery. Therefore, the project is not only functional, but also visibly appealing. It can also be seen in the model that the area around the buildings is highlighted by trees and grass. The purpose of this “green” outdoor environment provides a cleaner and more welcoming environment.

contact